I/O on Demand Savings Calculator. Measure your project's potential savings.
What is the size of your facility (number of I/O)?
Based upon your process equipment and facility layout, how would you choose the percentage of I/O between these technologies:
Control room-based Electronic Marshalling
Field/Junction box-based Electronic Marshalling
Fieldbus
Wireless
What are your average facility distances?
Control Room to Field Junction Box (m)
Field Junction Box to Field Device (m)
Do you require spare I/O installed? If so, what percent?
Number of I/O affected by Change Orders:
Number of Personnel engaged on project:
Man Hours saved on Change Orders:
Man Project Days saved on Project Schedule:
Results Analysis:
I/O On Demand Cost Estimation ($M)
User Defined
System
4.5 M
Traditional
Wired
5.47 M
$0
$2
$4
$6
$8
Control Room Marshalling
$0.31 M
Field Marshalling
$0.13 M
Fieldbus
$0.15 M
Wireless
$0.37 M
Materials
Labor Costs
Terminations
Engineer, Design, Procure, Configure & Commission
Note: Savings values are an estimate based on typical results.
DeltaV Home
|
DeltaV News
|
Request a Brochure
|
See Us in Action
|
Contact Us